As I take forever to complete the finishing touches on my first bathroom renovation, I’m also taking the time to reflect on all I’ve learned. Plus what I would do differently the next time. (And there will be a next time, as I have a second bathroom that also needs a complete renovation.)


When I started my bathroom renovation, I honestly was not sure if I could do it. I knew I would need a plumber to help with some parts. But I just had no idea what I would face and if I could overcome the challenges of such a big renovation. I also just had no real idea the steps of such a big project. While there are some good videos out there, there are many specific step-by-step tutorials on how to renovate a bathroom.
Until now!

I’ve written The Ultimate Guide to Renovating a Bathroom, with step-by-step instructions, in to do list form. I’ve covered every step in great detail on this blog over the last 6+ months, so you can follow along in your own renovation project.
Read the guide with links to all the posts, so you do not miss a thing:
Today, I want to take a look back at some of the broader learnings, in hopes to help you with your own renovation. These tips are not just relevant for a bathroom renovation, but for any DIY project you might undertake. After all, so much of the DIY experience is all about mindset and being willing to just give it a go and learn from whatever happens!
So, here are some of my insights to help with your first or next bathroom renovation, or any renovation, for that matter!
Expect the Unexpected
No matter how well you plan, you will need to adapt your plans somewhere along the way. Expect this. Do not let it surprise you. And, know that you will find a way. Somehow.
In my case, I needed to pivot quite a few times. Despite measuring everything out on the floor after demolition, my basin was too large for the space once we had the shower installed. I needed to move its location down the wall a bit and even considered moving it to another wall or installing a folding door to provide more wall space for the basin.

In the end, I am really happy with the placement. It is a little tight, but this is a small room, and a small flat. So everything is a tight fit!

I also had to change plans to add wall sconces over the basin. There just was no space for them. I had already ordered the sconces, and the period to return them had passed by the time I discovered that I would not be able to use them. But not to worry, they will be perfect in the second bathroom renovation. Unless they are not!
Other adaptations I had to make included the size of the shower pan (I had to go smaller) and I had to build the shower wall up to accommodate the height of the shower head I incorrectly measured. A bit of a frustration, but fixable.

Account for Mistakes in Your Budgeting and Ordering
I went a little over budget in my bathroom renovation, but most of this was due to the need to change out different products, or under-estimating what I needed. Some of this was due to the above point: the unexpected.
For example, because I did not build the shower wall high enough, I needed to build additional height to the stud wall and add more cement boards. I had only ordered enough cement boards, seam tape and screws and washers for the original design. Additional products, plus shipping and delivery, added to my costs. As well as the additional time required on the renovation.
I also needed to exchange the shower pan for a smaller one. When I discussed the return fees with the company where I purchased it, I decided that the larger shower pan would probably work in the second bath, so I kept it for the second renovation. This has cost and storage implications, but in the end, it should help save some costs.
Strangely, I have three full boxes extra of the floor tiles. I am not sure why there was so much overage, and the company will not accept returns. While I considered using the same flooring in the second bathroom, I have my heart set on a different look. I might try selling the additional tiles. We will see.

At the same time, I am glad I ordered extra grey metro tiles used in the shower. When I messed up the tile on my first go and when I had to build up the height on the shower wall, this was no problem, since I had extra.
Bottom line: Plan for overages and extras. They are inevitable.

Allow More Time
It took me a lot longer to finish the bathroom that I originally planned. In fact, I am still not done!!! I had thought a 4-month timeline would be fine, but it took over 6 months. While I am still not done, the bathroom is usable, and we are enjoying it. But I still have some little finishing bits to complete, and this always takes longer.
It also took time to schedule the plumber and the electrician when I was ready for them. For example, when it was time to install the underfloor heating and tiling over a long weekend, I realised on Friday morning that the electrician had not installed the right heating channel. I fought hard to get him there that day to fix the issue and not leave me with a long weekend where I could not progress things.

Everything also just always takes longer. I ran out of the right caulk and trim for finishing the last little bits, and I’ve not been able to get to the store. Hence the long delay on finishing. I was in the midst of cutting all the wall paneling when the blade on my circular saw gave out. Despite next day-delivery from Amazon, it was a few days before I could get back to the work.
And there are the challenges you face in any DIY project that simply require some time to stop, think, and adjust. The basin location took me a good week of planning and thinking before I was ready for the plumber, and then he was not available for another week or so. Building up the shower wall took two weeks, since I needed to order more supplies and find the time for the work. This delayed the plumber, and it added about four weeks to the project.
Delays are inevitable, no matter how good you are at DIY. So just plan for them, and be prepared when they happen. As best you can.
Stay Positive
It can be hard to maintain your enthusiasm and positivity when things do not go as planned in any renovation. It is quite funny for me to be writing this right now, since I am not very positive about the last steps of the bathroom renovation. I cannot seem to get to the store to pick up the final supplies I need. I’ve bought the wrong trim twice now, and I am not sure how I am going to patch the one area of wallpaper when I do not have a perfect match. All I need to do is some caulking, wood filler, wallpaper patching, and painting, and yet, a month has passed with no progress. (Granted, work and life have also gotten in the way of progress.)

I am honestly dreading finishing the bathroom and am only moments away from starting my next big DIY without this one being completed. Yet I know, it only takes the right mindset, and I will complete the little tasks and can call this bathroom done. I will get there, even if I am not feeling very positive right now.
I hope these tips and my encouragement are of help to you. DIY can be hard, and it is the final, and often easy finishing steps, that can be the hardest. Hang in there and know that you will get there. At least, that is what I keep telling myself!
Happy DIY-ing!